E. Flatiron Crossing Drive - US 36 to Brainard Dr.

News & Updates...............

Concrete Express has completed a majority of the subgrade reconditioning.  Sections of concrete curb and gutter as well as sections of red stamped concrete have been installed.  Lower and intermediate lifts of asphalt are scheduled for the week of July 13, 2020.  A switch in traffic control will follow paving operations to allow Concrete Express to complete the last section of subgrade reconditioning.  Final lift of asphalt for the entire project area is scheduled for July 24, 2020.  Pavement markings are scheduled to be installed the following week. Construction is expected to be complete in early August 2020.

E Flatirons Crossing July 2020 Open

E Flatirons Crossing US 36 July 2020

Background Information

This location was identified by Public Works Street Services as needing reconstruction due to its deteriorated pavement surfaces and significant drainage issues, which have been caused by sub-base failure.  Streets has attempted to mitigate these issues over the years, but the mitigation only addresses the road surface and not the failed sub-base.  The proposed street reconstruction at this location will address the failed sub-base, deteriorated pavement surfaces and drainage issues.  

In April 2018, Broomfield contracted with Muller Engineering Company, Inc. to complete the design of this street reconstruction project.

Council approved a Construction Agreement with Concrete Express for the E. Flatiron Crossing Dr - US 36 to Brainard Dr Reconstruction project on March 10, 2020.  E Flatiron Crossing Dr Project Location Map