Background Information
This location was identified by Public Works Street Services as needing reconstruction due to its deteriorated pavement surfaces and significant drainage issues, which have been caused by sub-base failure. Streets has attempted to mitigate these issues over the years, but the mitigation only addresses the road surface and not the failed sub-base. The proposed street reconstruction at this location will address the failed sub-base, deteriorated pavement surfaces and drainage issues.
In April 2018, Broomfield contracted with Muller Engineering Company, Inc. to complete the design of this street reconstruction project.
Council approved a Construction Agreement with Concrete Express for the E. Flatiron Crossing Dr - US 36 to Brainard Dr Reconstruction project on March 10, 2020. 